The Crystal River Energy Complex consists of seven power-generating plants on a 4,700-acre (1,900 ha) site near the mouth of the Crystal River in Citrus County, Florida. Crystal River 1, 2, 4, and 5 are fossil fuel power plants. Crystal River 3 was previously the sole nuclear power plant on the site (1977-2013). The Crystal River Combined Cycle site consists of two Mitsubishi gas turbines, which came on-line in 2018. The complex was developed in the early 1960s by the Florida Power Corporation and sold to Progress Energy Inc in 2000.[2] Following Progress Energy's merger with Duke Energy in 2012,[3] the facility is owned and operated by Duke Energy.[2]

In February 2013, Duke Energy announced that Crystal River 3 would be permanently shut down.[4]

Power plants

Reactor unit Reactor type Capacity Construction started Electricity grid connection Commercial operation Shutdown
Net Gross
Unit 1 Coal, water-cooled 373 MW 441 MW October 1966 2019
Unit 2 Coal, water-cooled 469 MW 524 MW November 1969 2019
Unit 3 Nuclear 860 MW 890 MW September 25, 1968[5] January 30, 1977 March 13, 1977 February 5, 2013
Unit 4 Coal, air, and water-cooled 717 MW 739 MW December 1982
Unit 5 Coal, air, and water-cooled 717 MW 739 MW October 1984

See also

References

  1. ^ "Electricity Data Browser". www.eia.gov. Retrieved September 28, 2017.
  2. ^ a b Murawski, John (January 10, 2011). "Merger means uncertainty for Raleigh utility's workers". News & Observer. Archived from the original on January 11, 2011. Retrieved January 10, 2011.
  3. ^ "Duke Energy, Progress Energy to merge in $26B deal". WRAL-TV.
  4. ^ "Crystal River Nuclear Plant to be retired; company evaluating sites for potential new gas-fueled generation". February 5, 2013. Archived from the original on October 22, 2013. Retrieved June 14, 2013.
  5. ^ "CRYSTAL RIVER-3". Power Reactor Information System. International Atomic Energy Agency. Retrieved August 23, 2019.

External links