Fort Towson

State Route 752 (SR 752) is an east–west state highway in the south-central portion of Ohio. The western terminus of SR 752 is at a signalized T-intersection with US 23 on the north edge of South Bloomfield, and its eastern terminus is at SR 674 about 7 miles (11 km) east of Ashville on the Pickaway-Fairfield County Line.

SR 752 was created in the late 1930s. This two-lane state highway, which runs through the northeastern portion of Pickaway County, is becoming more highly traveled in recent years, as subdivisions are being constructed at a rapid rate in the Teays Valley Local School District.

Route description

The entirety of SR 752 is located in the northeastern quadrant of Pickaway County. No portion of the highway is included as a part of the National Highway System.[2]

History

SR 752 was designated in 1937, following the alignment that it occupies to this day. No changes of major significance have taken place to this state route since its inception.[3][4]

Major intersections

CountyLocationmi[1]kmDestinationsNotes
PickawaySouth Bloomfield0.000.00 US 23
Ashville1.822.93
SR 316 west / CR 28 (Ashville Pike)
Eastern terminus of SR 316
PickawayFairfield
county line
WalnutAmanda
township line
8.4313.57 SR 674 / Royalton Road
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

KML is from Wikidata
  1. ^ a b Ohio Department of Transportation. "Technical Services Straight Line Diagrams" (PDF). Retrieved 2013-07-07.
  2. ^ National Highway System: Ohio (PDF) (Map). Federal Highway Administration. December 2003. Retrieved 2010-08-18.
  3. ^ Ohio State Map (Map). Ohio Department of Transportation. 1936.
  4. ^ Ohio State Map (Map). Ohio Department of Transportation. 1937.