Battle of Backbone Mountain

The Amrit Bharat Express is a superfast express service operated by Indian Railways. It is a non-air-conditioned, low-cost, sleeper cum unreserved service connecting cities that are more than 800 km (500 mi) apart or take more than ten hours to travel with existing services. The trainset consists of two locomotives, one on either side and 22 coaches with a maximum operating speed of 110–130 km/h (68–81 mph). The train entered commercial service on 1 January 2024.

History

In July 2023, Indian railways announced plans for a non-air-conditioned train with sleeper and general facilities for long-distance travel.[1] The trainsets are manufactured by Integral Coach Factory, Chennai at the cost of 65 crore (US$8.1 million) per trainset.[2] The first train was flagged off on 30 December 2023 and entered commercial service on 1 January 2024.[3]

Services

On 30 December 2023, the train was flagged off by then Prime Minister Narendra Modi from Ayodhya Dham Junction.[4] The first commercial service commenced on 1 January 2024.[5]

S.No. Train name Train number Origin station Terminal station Operator Halts Frequency Distance Travel time Speed Inaugural run Ref
Maximum Average
1 Darbhanga–Anand Vihar Terminal Amrit Bharat Express 15557/15558 Darbhanga Junction Anand Vihar Terminal ECR 18 Bi-Weekly 1,137 km (706 mi) 20h 40m 130 km/h (81 mph) 55 km/h (34 mph) 30 December 2023 [6][7]
2 Malda Town–SMVT Bengaluru Amrit Bharat Express 13433/13434 Malda Town SMVT Bengaluru ER 32 Weekly 2,272 km (1,412 mi) 45h 10m 130 km/h (81 mph) 50 km/h (31 mph) [6][8]

See also

References

External links